Fabrication and construction of 9 each 145,000 liter UL 142 rated horizontal diked fuel tanks and associated fuel piping.

The Project
Name: USACE Tin City
Category: Mechanical Piping

Water System Improvement Project – Vale, Oregon
T BAILEY operated as the general contractor and was awarded the Water System Improvement Project for the City of Vale, Oregon. The project was designed to eliminate toxins from the city’s drinking water, specifically arsenic. The City of Vale received funding from the Federal Safe Drinking Water Revolving Loan Fund which utilizes American Iron and Steel (AIS) Requirements for the Project. AIS requires all building materials utilizing iron or steel products to be produced in the United States.
12MG Clearview Reservoir
Before erecting the new 12MG 184′ d x 63′ high water reservoir, T Bailey, INC. prepped the site including clearing approximately 6.5 acres, mass excavation of over 40,000 cy, grading, and 2000LF of large diameter transmission and yard piping.
Bulk Fuel Facility Improvements – Lower Yukon School District
Replace the existing fuel systems and tanks with new UL tanks and fueling systems at the Russian Mission and Sheldon Point villages.
161st Avenue Pumpstation – Bellevue, WA
T BAILEY, INC. built a new pump station that included 2 horizontal pumps, metering system, piping, valves, and restroom facilities.
Fire Fighting Training Pit – NAS Whidbey, WA
Project included construction of a fire fighting training facility including: fuel piping, solenoid valves and nozzles, buried fuel tank, secondary containment piping, fuel skimmer and storage, control building and pump station, electrical, site work, high temperature resistant concrete pads, and structural steel mock-up.
Maple Ridge Pumpstation – Maple Valley, WA
T BAILEY, INC. built a new pump station with a backup generator and chlorination system that included 2 vertical and 4 horizontal pumps to supply water to the new Maple Ridge Highlands housing development.
Blair Lakes Complex Fuel & Water Tanks – Eielson AFB, AK
T BAILEY, INC. designed, fabricated, erected, painted, and installed cathodic protection and insulation on (1) 90,000 gallon water tank and (2) 125,000 gallon fuel tanks. In addition we provided and installed supply, distribution, and interconnecting mechanical fuel piping and equipment.
Peter Pan Seafoods – King Cove, AK
T BAILEY, INC. constructed a new 15,000 sf containment dike, relocated 2 ea 300,000 gallon API 650 tanks to a new tank farm, and installed the process piping and equipment, pump house, above and underground fuel lines to dock receiving/issuing station.