Guam Project
The Crowley tank project is one of the largest tank projects T BAILEY, INC. has undertaken. With four million pounds of steel being used and shipped to the project site, three tanks were constructed near Fairbanks, Alaska.
Read ArticleROC Equipment Hawaii Light Rail Casing Fabrication Project
T BAILEY INC. was brought on as a supplier to fabricate the drilled shaft casing for the new Honolulu Rail Transit Project (also called the Honolulu High-Capacity Transit Corridor Project).
Read ArticleCrowley Tank Construction
The Crowley tank project is one of the largest tank projects T BAILEY, INC. has undertaken. With four million pounds of steel being used and shipped to the project site, three tanks were constructed near Fairbanks, Alaska.
Read ArticleSeaside East Hills Reservoir Project
Seaside is a picturesque city that hugs the Oregon coast and hosts thousands of tourists and year-round residents. The City of Seaside embarked on a project to build a new high school as a tsunami evacuation location high on a hill overlooking the city.
Read ArticleHighline Mansion Hill Reservoir Relocation Project
T Bailey INC. was brought onto the Highline Mansion Hill Reservoir project as a general contractor to help Highline Water District relocate a large water reservoir.
Read ArticleKlamath Irrigation District Penstock Project
T BAILEY, INC. fabricated, coated and delivered approximately 786 LF of 119” diameter ½” thick steel pipe in various lengths ranging from 5’ L – 43’ L, including 3 elbow sections, 12 ring girders, 24 slide bearing / fixed bearing supports, trash rack structure and 215’ of catwalk.
Read ArticleClear Air Force Base Fireguard Tanks
T BAILEY, INC. fabricated, coated and delivered approximately 786 LF of 119” diameter ½” thick steel pipe in various lengths ranging from 5’ L – 43’ L, including 3 elbow sections, 12 ring girders, 24 slide bearing / fixed bearing supports, trash rack structure and 215’ of catwalk.
Read ArticleTesoro’s Avon Wharf Facility Steel Pile Cap Frames
T BAILEY, INC. fabricated, coated and delivered approximately 786 LF of 119” diameter ½” thick steel pipe in various lengths ranging from 5’ L – 43’ L, including 3 elbow sections, 12 ring girders, 24 slide bearing / fixed bearing supports, trash rack structure and 215’ of catwalk.
Read ArticlePort of Alaska Dock Piling Fabrication
T BAILEY, INC. fabricated, coated and delivered approximately 786 LF of 119” diameter ½” thick steel pipe in various lengths ranging from 5’ L – 43’ L, including 3 elbow sections, 12 ring girders, 24 slide bearing / fixed bearing supports, trash rack structure and 215’ of catwalk.
Read ArticleShell Puget Sound Refinery – Degassing Drum Fabrication
T BAILEY, INC. fabricated, finish painted, and delivered a 14’-0” Dia. x 57’-0” long ASME Code pressure vessel for Shell’s Anacortes, WA refinery.
Read ArticleAberfeldie Bifurcation – BC Hydro
T BAILEY, INC. received the 2009 STI/SPFA Pipe Fabrication Award for the fabrication, finish painting, and delivery of 4 each bifurcations and 900 lf of large diameter steel penstock for the Aberfeldie Redevelopment Project in Cranbrook, BC. The fabricated pieces received a 2 coat epoxy interior coating and the exterior received 1 coat of epoxy and 1 coat of urethane.
Read ArticleConoco Phillips Water Injection Storage Tanks
T BAILEY, INC. fabricated, finish painted and delivered 2 each 12’d x 32’l 660 BBL API 650 storage tanks for ConocoPhillips Beluga Gasfield in Alaska. The tanks were finish painted with a 3 coat epoxy interior and a 2 coat epoxy exterior system.
Read Article