The new 80’diameter x 115’h 4.2MG water tank sat on a 110′ diameter x 4.5′ thick mat foundation with a 5.5′ tall ringwall. The foundation contained over 1800 cy of concrete, 147 tons of rebar and 86 each 2 1/2" diameter anchor bolts. The project had a total of 7000 cy of mass excavation to accommodate the new foundation and detention pond.
1800
CY OF CONCRETE
147
TONS OF REBAR
86
ANCHOR BOLTS
The Project
Name: 4.2MG Hazen Reservoir Foundation
Category: Civil Construction