Project included demolition/removal of an existing standpipe and construction of a new 2.5MG water reservoir, foundation, associated site earthwork/grading, utilities, electrical, telemetry, etc. The new foundation consisted of approximately 1000 cy of concrete to form a 87’ diameter mat foundation for the reservoir with 76 anchor bolts and approximately 144,000 lbs. of steel reinforcement.
Read more about our steel water storage tank fabrication services.
1000 CY
Concrete
87'
DIAMETER FOUNDATION
144,000 lbs
STEEL ENFORCEMENT
The Project
Name: Boulevard Road Reservoir Foundation
Category: Civil Construction
Related Projects
What are you building?
We’re designed to perform custom fabrication of heavy structural and plate products, and can directly ship oversized loads via barge, rail, or truck to your location.
Let's Discuss a Project