Swift Hydroelectric Project Surge Arresting Structure

T BAILEY, INC. fabricated and installed approx. 230 lf of 16′ diameter penstock that began with a complex square to round transition to connect to an existing point and ended in a bifurcation that split into approx. 200 lf of 11′ diameter penstock that connected to two existing points already encased in concrete.

The Project

Name: Swift Hydroelectric Project Surge Arresting Structure
Category: Shop Fabrication

What are you building?

We’re designed to perform custom fabrication of heavy structural and plate products, and can directly ship oversized loads via barge, rail, or truck to your location.

Let's Discuss a Project