Imperium Renewables Biodiesel Facility – Grays Harbor, WA

2007 Steel Tank Institute Project of the Year Award Winner.

T BAILEY, INC. provided design, detailing, steel fabrication, wheelabrating, shop priming, and field erection for 17 each welded steel storage tanks for this state of the art biodiesel production facility. With a crew that reached 35 at its maximum, T BAILEY, INC. managed to complete all 17 tanks in 6 months, having worked straight through one of the wettest and windiest winters in Washington State history to meet the strict deadlines set to get the tanks into service.

On August 15th, 2007, Imperium Renewables officially opened Imperium Grays Harbor – the largest biodiesel facility in the nation, with 100 million gallons per year production capacity.

17
TANKS
2007
STEEL TANKS INSTITUTE PROJECT OF THE YEAR
6
MONTHS

The Project

Name: Imperium Renewables Biodiesel Facility
Category: Steel Construction

What are you building?

We’re designed to perform custom fabrication of heavy structural and plate products, and can directly ship oversized loads via barge, rail, or truck to your location.

Let's Discuss a Project