Casing Gerald Desmond Bridge Replacement

Casing Gerald Desmond Bridge Replacement

T BAILEY, INC. fabricated approximately 72 pieces of oscillator casing in various sizes from 1500mm to 2500 mm in diameter in typical 24’ long sections provided in both 1” and 2” carbon steel wall thicknesses for the Gerald Desmond Bridge Replacement project located in Long Beach, CA.

Read Article

Barge Load Out Facility

T BAILEY’s barge loadout facility is located on the Swinomish Channel within a mile of our March Point Road, Anacortes, WA fabrication shop. The barge shown above is 180’ in length and 45’ wide with 3 each 12’6” diameter x 44’ long pressure vessels loaded for shipment to Alaska.

Read Article

Swift Dam Penstock and Bifurcation Project

T BAILEY, INC. fabricated and installed approx. 230 lf of 16′ diameter penstock that began with a complex square to round transition to connect to an existing point and ended in a bifurcation that split into approx. 200 lf of 11′ diameter penstock that connected to two existing points already encased in concrete.

Read Article

Conoco Phillips Water Injection Storage Tanks

T BAILEY, INC. fabricated, finish painted and delivered 2 each 12’d x 32’l 660 BBL API 650 storage tanks for ConocoPhillips Beluga Gasfield in Alaska. The tanks were finish painted with a 3 coat epoxy interior and a 2 coat epoxy exterior system.

Read Article

Golden Crossing Casing

T BAILEY, INC fabricated and delivered over 4000 lf of 99” OD x 0.787” bridge piling for the new Golden Crossing Bridge project in Langley, BC.

Read Article

13 Each STI F921 Double Wall Fuel Tanks

T BAILEY, INC. fabricated and delivered 13 each 20,000 gallon STI F921 double wall fuel storage tanks for the US Navy’s facility in Bremerton, WA.

Read Article

Barge Load Out Location

The map above depicts our March Point Road Steel Fabrication Shop in proximity to our Barge Load Out Facility.

Read Article

BC Hydro Aberfeldie Redevelopment Project

T BAILEY, INC. received the 2009 STI/SPFA Pipe Fabrication Award for the fabrication, finish painting, and delivery of 4 each bifurcations and 900 lf of large diameter steel penstock for the Aberfeldie Redevelopment Project in Cranbrook BC.

Read Article

North West Arctic Borough Fuel Tanks

T BAILEY, INC. fabricated, finish painted and delivered 2 each 50,000-gallon fuel tanks that were 12’d x 59’6” long and 1 each 12,000 gallon 8’d x 35′ long UL142 double wall skid mounted welded steel diesel bulk fuel storage tanks. The exteriors of the tanks received a 3 coat finish paint system of zinc primer, epoxy, and urethane.

Read Article

Penstock- Klamath Irrigation District

T BAILEY, INC. fabricated, coated and delivered approximately 786 LF of 119” diameter ½” thick steel pipe in various lengths ranging from 5’ L – 43’ L, including 3 elbow sections, 12 ring girders, 24 slide bearing / fixed bearing supports, trash rack structure and 215’ of catwalk.

Read Article