Westway Terminals Aberdeen, WA

Westway Terminals Aberdeen, WA

4 each 80 BBL API 650 Storage Tanks 120′ diameter x 40′ high with internal floating roofs. This was a design/build project for a private developer. All 4 tanks were field erected in a five-month window to meet the client’s schedule to become operational.

Read Article

Maple Ridge Highlands 4MG Reservoir – Maple Valley, WA

T BAILEY, INC. erected a new 4MG 105’d x 68′ tall water reservoir for a private developer in the new Maple Ridge Highlands Community. We also erected a new 26’d x 133’h standpipe and a complete pump station for the water system in this new development.

Read Article

Water System Improvement Project – Vale, Oregon

T BAILEY operated as the general contractor and was awarded the Water System Improvement Project for the City of Vale, Oregon. The project was designed to eliminate toxins from the city’s drinking water, specifically arsenic. The City of Vale received funding from the Federal Safe Drinking Water Revolving Loan Fund which utilizes American Iron and Steel (AIS) Requirements for the Project. AIS requires all building materials utilizing iron or steel products to be produced in the United States.

Read Article

12MG Clearview Reservoir

Before erecting the new 12MG 184′ d x 63′ high water reservoir, T Bailey, INC. prepped the site including clearing approximately 6.5 acres, mass excavation of over 40,000 cy, grading, and 2000LF of large diameter transmission and yard piping.

Read Article

Swift Hydroelectric Project Surge Arresting Structure

T BAILEY, INC. fabricated and installed approx. 230 lf of 16′ diameter penstock that began with a complex square to round transition to connect to an existing point and ended in a bifurcation that split into approx. 200 lf of 11′ diameter penstock that connected to two existing points already encased in concrete.

Read Article

3MG Reservoir – Wainwright, AK

T BAILEY, INC. constructed a new 130′ diameter x 32′ high 3MG painted and insulated water reservoir for the North Slope Borough.

Read Article

Education Hill & Perrigo Upgrades – Redmond, WA

Tank improvements to 3 existing water reservoirs including ladders, platforms, roof vents, shell stiffeners (pictured above), piping, and interior and exterior concrete foundation improvements.

Read Article

Covington Tank Rehabilitation

T BAILEY performed extensive rehabilitation on an existing welded steel water tank including major foundation modifications, removing, seal welding, and replacing the entire roof, adding two additional shell courses, spiral stairs, demolition of an adjacent tank and foundation, and additional tank and site upgrades.

Read Article

4.2 MG Hazen Reservoir – Renton, WA

The new 4.2MG water reservoir was 80’d x 115’high. T BAILEY, INC. donated the cost to paint a custom logo on the tank for the local high school located next to the tank site.

Read Article

Coyote Springs II Power Project, Boardman, OR

Fabrication and field erection of a new 18′ diameter x 210′ tall steel single wall stack for the Coyote Springs II Power Project.

Read Article

Muckleshoot Standpipe – Auburn, WA

915,000 gallon Muckleshoot Standpipe in Auburn, WA constructed in 1996 for Indian Health Services. Upper tank and roof were constructed on the ground and lifted into place.

Read Article

High Tank #2 – Lynnwood, WA

In 2001 T BAILEY, INC. built the new 74’d x 88’h 3.5MG High Tank #2 (shown above) and a new 150’d x 30’h 3MG Nike tank as well as performed upgrades on two existing water tanks for the Alderwood Water District.

Read Article